Milestone reached in Maine as 100th turbine erected
Contractor's 100th windmill goes up in Maine (From: Google.com)
The first 100 wind turbines took about three years to bring online, but the next 100 should be operating in no more than two years.
PalmSprings@16.12.2009 23:16
Back