1800 blades for Samsungs new line of 2.5 MW turbines
LM Glasfiber lands 5-year wind deal with Samsung (From: Associated Press)
Glasfiber expects to produce enough blades for 600 turbines for Samsung Heavy Industries Ltd.
Martha@19.12.2009 01:35
Glasfiber expects to produce enough blades for 600 turbines for Samsung Heavy Industries Ltd.
Martha@19.12.2009 01:35
| February 2012 | ||||||
|---|---|---|---|---|---|---|
| Su | Mo | Tu | We | Th | Fr | Sa |
| 1 | 2 | 3 | 4 | |||
| 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| 12 | 13 | 14 | 15 | 16 | 17 | 18 |
| 19 | 20 | 21 | 22 | 23 | 24 | 25 |
| 26 | 27 | 28 | 29 | |||
Back